| 1. Site excavation & drainage |
|
2. Concrete slab poured |
| |
|
|
|

|
|
 |
| 3. Pre-cut and pre-nailed framing erected |
|
4. Roof on & building wrapped |
| |
|
|
 |
|
 |
| 5. Windows installed |
|
6. Cladding installed |
| |
|
|
 |
|
 |
| 7. Electrical & plumbing (behind the wall) |
|
8. Pink® Batts® Insulation installed |
| |
|
|
 |
|
 |
| 9. Pre-Hung Doors installed |
|
10. GIB® Plasterboard wall linings |
| |
|
|
 |
|
 |
| 11. Install Bathroom & Plumbing fixtures |
|
12. Criterion Kitchen installed |
| |
|
|
 |
|
 |
| 13. Paint the House and Finishing work |
|
14. Construction completed! |
| |
|
|